Conover Material Recovery Facility

Conover, NC

conover-remove-date

Design/build services for the additions and renovations to an existing MRF to convert the operation to a 25 ton per hour single stream MRF. The project included demolition of the existing operating line, several minor building expansions, construction of new conveyor pits, pushwalls, electrical system upgrade and renovation of existing employee facilities. The project required close coordination with Bulk Handling Systems (BHS) to insure the recycling equipment would fit within the confines of the existing structure. The work also required close coordination with the facility management as a portion of the facility remained in operation during the construction.