Design/build services for the fast-track construction of this landfill gas to high BTU (pipeline quality) natural gas processing facility. Site development included brush removal, placing over 1,850 cy of fill and the installation of underground utilities, including approximately 4,800 feet of water line. Work also encompasses the offloading and installation of all processing equipment, including a landfill gas compression system, flare, compressors, adsorption and storage vessels, thermal oxidizer and all the interconnecting piping, pipe supports and instrumentation. The processing plant also includes approximately 3,500 sf of office and storage space, along with nitrogen and propane systems, and the allocation of space for an interconnection with Memphis Light, Gas and Water.